The Audit Checklist gives you a structured, pass/fail view of compliance across your project. CIM Build automatically generates checks from your uploaded specification documents, and you can add your own quality gate checks on top. The checklist tracks every result so you always have a current picture of where your project stands against its specification and review obligations.Documentation Index
Fetch the complete documentation index at: https://support.cim.build/llms.txt
Use this file to discover all available pages before exploring further.
Opening the checklist
Click Audit Checklist in the left sidebar. At the top of the page, a status summary bar shows you:- The total number of checks in your project
- How many have passed (shown in green)
- How many have failed (shown in red)
- How many have not yet run (shown in grey)
Check groups
The left panel organises checks into four groups.All
All
Every check across your project in a single list. Use this view to get a full picture of compliance status, or to search and filter across all check types at once.
Report Specs
Report Specs
Checks generated automatically from your uploaded specification documents. CIM Build reads your specification PDFs and creates individual checks for each requirement it extracts. These checks are tied directly to their source documents so you can trace every check back to the specification page it came from.
Global
Global
Shared checks that apply across all projects in your organisation. These are typically standard review criteria or regulatory requirements that your team applies consistently regardless of project type.
Gate
Gate
Quality gate checks with structured review criteria. Gates are milestone-based checkpoints — for example, a design review gate or a pre-tender gate — that group related checks together into a reviewable package.
Running checks
Find the check to run
Browse or search for the check you want to execute. Checks are listed in the main table with their current status, associated workflow, and last run time.
Click Run
Click the Run button next to the workflow you want to execute. CIM Build will queue the check and begin processing.
Select evidence files if prompted
Some checks — such as the Background Discrepancy Check — require you to specify which files to use as evidence before running. A file selection dialog will appear. Choose the relevant files and confirm to proceed.
Adding checks
- Add Risk Check
- Add Gate
Click Add Risk Check to open a dialog that lets you create a new workstream-based check. Choose the workstream, define the check criteria, and save it. The check will appear in the checklist and can be run like any other.
Reviewing specifications
Click on any specification name in the checklist to open a detailed specification view. This view shows:- The full specification text and its associated trades
- Associated workflows and their current pass/fail status
- A PDF viewer positioned directly to the relevant page in the source document, so you can read the original specification text in context
Tips
You can also navigate directly to an audit check from the Reports page. Click the Checklist button on any specification row in Reports to jump straight to the associated check in the checklist, with it scrolled into view and highlighted.
