> ## Documentation Index
> Fetch the complete documentation index at: https://support.cim.build/llms.txt
> Use this file to discover all available pages before exploring further.

# Risk Register: reviewing AI-detected design risks

> Use the Risk Register to find, filter, and act on compliance gaps, missing details, and design issues that CIM Build surfaces across your drawings.

The Risk Register is where CIM Build surfaces all AI-detected design risks for your project — compliance gaps, missing details, and potential issues found across your uploaded drawings and specifications. Every risk includes a severity rating, a plain-language rationale, and links back to the affected drawings so you always know exactly what triggered the flag and what needs attention.

## Reviewing risks

<Steps>
  <Step title="Open the Risk Register">
    Click **Risk Register** in the left sidebar to open the register.
  </Step>

  <Step title="Browse the risk list">
    The left panel lists all detected risks. Use the group selector at the top of the panel to switch between groupings — **by severity**, **by workstream**, or **by sub-project**. Each item in the list shows the severity level, current status, and a short description so you can scan quickly.
  </Step>

  <Step title="Open the Risk Detail panel">
    Click any risk to open the **Risk Detail** panel on the right. This panel shows:

    * **Severity and status** — the risk level and its current workflow state
    * **Description and rationale** — what was detected and why CIM Build flagged it
    * **Affected drawings and documents** — with direct PDF references to the relevant pages
    * **Action items** — specific tasks assigned to the relevant consultant
  </Step>
</Steps>

## Filtering and searching

The toolbar above the risk list gives you several ways to narrow down what you see.

* **Search** — click the search icon and type a keyword to find risks by text content.
* **Filter** — click the filter icon to open the filter panel. You can filter by:
  * Status: **Open**, **Closed**, **Approved**, or **Dismissed**
  * Labels
  * Criticality
  * Date range
  * Workstream
  * Sub-project
* **Sort** — reorder the list by date, severity, or code.

<Tip>
  Combine filters with sorting to focus on the highest-severity open risks in a specific workstream — useful when preparing for a consultant review meeting.
</Tip>

## Taking action on risks

<Tabs>
  <Tab title="Approve or dismiss">
    * Click **Approve** on any risk to confirm it needs attention and escalate it for action.
    * Click **Dismiss** to mark a risk as not applicable to your project. Dismissed risks remain in the register for audit purposes but are excluded from the default view.
  </Tab>

  <Tab title="Create manually">
    Click the **+** button in the toolbar to open the create dialog and add a risk that CIM Build did not automatically detect. Fill in the description, severity, workstream, and any relevant action items.
  </Tab>

  <Tab title="Bulk delete">
    Enable checkbox mode by clicking the bulk select control in the toolbar. Select multiple risks, then click **Delete** to remove them in one action.
  </Tab>
</Tabs>

## Viewing modes

Switch between three views using the mode selector at the top of the register.

<AccordionGroup>
  <Accordion title="Risk View">
    The default view. Shows a flat list of all risks in the register, grouped by your chosen grouping (severity, workstream, or sub-project). Start here to get an overview of what CIM Build has detected.
  </Accordion>

  <Accordion title="Consultant Actions">
    Shows action items grouped by risk, making it easy to see exactly what each consultant needs to address. Use this view when distributing work to your team or reviewing progress on outstanding items.
  </Accordion>

  <Accordion title="Review Drawings">
    Opens a visual canvas showing the drawings with risks annotated directly on them. This view is useful for understanding the spatial context of a risk — you can see exactly where on a drawing an issue was found.
  </Accordion>
</AccordionGroup>

## Exporting

Click the **Download** button in the toolbar to export the full risk register — including risks and their associated action items — as a **PDF** or **Excel** file. Use PDF for sharing with stakeholders and Excel when you need to sort or process the data further.
